In the
mold quality, delivery cycle, price, service four elements, there are more and more users will delivery cycle in the first place. Requires tooling company as soon as possible delivery, which has become a trend. Enterprises do everything possible to improve their adaptive capacity, improve the technical level, improve the level of equipment, improve the management level and efficiency, and so are the effective means to shorten the production cycle of the mold.
Greatly improve the development capabilities, the development work as far as possible to push forward, until the product development of the user's product development, even in the no clear user object before the development, change the passive to active. At present, the TV and display case, air conditioner shell, motorcycle plastic parts, such as the use of this method, the development of mobile phones and telephone sets have begun to try. This practice has broken a long time, the mold factory can only wait for a contract, in order to design the passive situation based on the requirements of the user.
China mold industry has more than 10 national high-tech enterprises, about 200 provincial and municipal high-tech enterprises. With this trend, the main backbone of the production of the main force from the technical talent to gradually shift to technical talent is the inevitable requirement. Of course, at present and for quite a long time, the technical talent is still very important, because the mold is difficult to completely get rid of the technology.
Mold enterprises and
mold production is developing rapidly to the information. In the information society, as a high level of modern mold enterprise, the application of CAD/CAM is far from enough. At present, many enterprises have adopted CAT, PDM, CAE, CAPP, KBE, KBS, ERP, RE, CIMS, and other advanced technology and other advanced manufacturing technology and virtual network technology, which are the performance of information technology, to develop this trend has become the industry consensus.